+44 (0)1642 806080

News Archive: September 2020

GE Renewable Energy launches the uprated Haliade-X 13MW wind turbine for the UK’s Dogger Bank Wind Farm

Published on the 22nd September 2020

GE Renewable Energy to supply 190 Haliade-X turbines for Dogger Bank A and B The project will be first in the world to feature the 13MW variant of GE Renewable Energy’s Haliade-X platform GE confirms marshaling harbor activities at Able

Continue Reading

FURTHER JOBS BOOST FOR NORTH EAST OF ENGLAND AS DOGGER BANK WIND FARM PLACES RECORD-BREAKING TURBINE ORDER WITH GE RENEWABLE ENERGY

Published on the

Dogger Bank Wind Farm, the largest wind farm in the world under construction, has confirmed GE’s 13MW Haliade-X as the turbine powering the first two phases of the project Able Seaton Port in Hartlepool, UK confirmed as marshalling base for

Continue Reading

ABLE CHIEF HAILS ‘BRAVE NEW WORLD’ AS KOREAN MANUFACTURER SELECTS AHP

Published on the 18th September 2020

The head of Able UK has today predicted that the Humber Ports Port is ready to become a ‘a vital part of the brave new world’ of offshore wind as one of the world’s leading pipe manufacturers confirmed its intention

Continue Reading